[Sticky] AC Load, Grid and AC PV  


0

Models an AC Load, Grid and AC PV

HOMER Pro 3.9

This dispatch sets the PV generation to serve the load if the available generation exceeds the requested load. Otherwise, grid supply is used to meet the shortage.

 
  
Working

Please Login or Register